Pricing

Priced by outcome, not by the hour.

Every engagement includes strategy, design, and engineering. Here is how they're shaped.

Hourly rates
None
Estimates that drift
None
Numbers per proposal
One
01

Sprint.

A focused engagement to shape, prototype, or unblock one specific thing.

Best if you have one decision to make and two weeks to make it.

  • Strategy and direction
  • A working prototype or a plan
  • Findings you keep either way
Timeline1 to 2 weeksFrom$7,500
03

Partnership.

A retained monthly engagement for teams that ship continuously.

Best if you are past launch and want senior hands on every release.

  • A standing senior team
  • Design and engineering on call
  • A steady weekly shipping cadence
TimelineMonthly, three-month minimumFrom$9,000/mo

Estimate your engagement

Engagement
Scope
Add

From

$61,000

Illustrative estimate, not a quote.

Start a project with this scope

Always included

Whatever the shape, the standard holds.

In every engagement

  • Strategy
  • Product design
  • Engineering

Built in, not billed extra

  • A performance budget
  • Accessibility to AA
  • A codebase you own

How it starts

  1. 01

    Write one line

    Tell us what you are building. A sentence is enough, the brief comes later.

  2. 02

    Talk for thirty minutes

    One call to hear the shape of it and say honestly whether we are the right fit.

  3. 03

    Get a fixed proposal

    Scope, timeline, and one number. No estimates that drift, no hourly meter.

Fair questions

Asked before, answered straight.

Why no hourly rates?

Because hours measure effort and you are buying an outcome. A fixed scope with a fixed number puts the risk of slow work on us, where it belongs.

How accurate is the estimate?

It is a starting point, not a quote. It gets you in the right range so the first call is useful. The real number comes after we understand the actual scope, and it does not drift once agreed.

Which model fits a redesign?

Usually Build. If the ground is uncertain, a Sprint first is the cheaper way to find out, and its findings roll into the Build if you continue.

Can we start small?

Yes, that is what the Sprint is for. Two weeks, one focused question, and you keep everything we make regardless of what happens next.

Who actually does the work?

The people you meet on the first call. We are a small senior team and we do not subcontract the thinking.

What happens after launch?

Every Build includes a quarter of measurement. We watch the numbers we promised, tune what needs it, and hand over clean. Ongoing work becomes a Partnership if you want us to stay.